On August 23, the Chandrayaan-3 rover will land on the Moon
On August 23, the Chandrayaan-3 rover will land on the Moon

“Chandrayaan-3 Sets its Course: India’s Lunar Mission Aims for Moon Landing on August 23, 2023”

//

On August 23, the Chandrayaan-3 rover will land on the Moon, leaving an indelible mark of India’s presence on the lunar surface. The lunar regolith will bear the imprints of the public seal and ISRO (Indian Space Research Organisation) logo, symbolizing this historic achievement. This mission will be the first of its kind to the Moon’s south pole, a region unexplored by any other country.


The Pragyan rover, weighing 27 kilograms and equipped with six wheels, proudly displays the embossed ISRO logo and the national crest on its back wheel. The Chandrayaan-3 module comprises the propulsion, lander, and rover, capable of carrying six payloads. These payloads will enable ISRO to understand the lunar surface better and capture images of the Earth from a lunar orbit.


While the propulsion module’s payloads can last up to six months after the ejection, the lander and rover have a mission life of one lunar day, equivalent to fourteen Earth days. The rover will conduct thorough analyses of the lunar surface with great care.


One of the key instruments on board the rover is the Laser Actuated Breakdown Spectroscope (LIBS), which, along with an Alpha Particle X-ray Spectrometer (APXS), will determine the local environment close to the landing site. The lander payloads, including RAMBHA and ILSA, will also study the lunar climate and extract mineral composition data by drilling into the surface.


As it roams and deploys various instruments, Pragyan will focus on monitoring the Moon’s seismic activity while Vikram captures images. An attempt will be made to soften a section of the lunar surface using laser radiation.
In a successful launch, ISRO’s mission control propelled the Chandrayaan-3 lander into Earth’s orbit, setting it on course for a lunar landing the following month. If accomplished, India will join the ranks of the United States, the former Soviet Union, and China as one of the few nations to achieve a controlled lunar landing.


The planned landing site of Chandrayaan-3, the lunar south pole, holds significant interest for both public and private space organizations due to the presence of water ice, which could support future space exploration endeavors.
On July 14, 2023, at 2:35 PM local time (09:05 GMT), the rocket carrying Chandrayaan-3 was launched from India’s main spaceport. Over 1.4 million people watched the launch on ISRO’s YouTube account, with many congratulating and chanting “Jai Hind” (Victory to India).


It is worth noting that the Chandrayaan-2 mission successfully launched an orbiter in 2019, although the lander and rover had an unfortunate crash near the intended landing site of Chandrayaan-3.
Chandrayaan, meaning “moon vehicle” in Sanskrit, features a 2-meter-tall lander that will transport a traveler close to the Moon’s south pole, facilitating a series of tests over an extended period.


The lunar landing for Chandrayaan-3 is scheduled for August 23, according to ISRO. This mission represents a significant milestone for India, especially in light of the government’s efforts to foster interest in space exploration and related satellite-based ventures.


In a tweet, Prime Minister Narendra Modi stated that the moon expedition would embody the deepest aspirations of the country. During the launch ceremony at the spaceport, Jitendra Singh, the Minister of State for Science and Innovation, expressed India’s determination to assume a leading global role in the emerging space scenario as the nation enters the next 25 years.


Since opening up private participation in space missions around 2020, India has witnessed a surge in new startups in the space sector. In late 2022, Skyroot Aerospace, backed by investors such as Singapore’s sovereign wealth fund GIC, successfully launched India’s first privately built rocket.


Correction: The Chandrayaan-2 mission was launched in 2019, not 2020, as mentioned in section 7 of this report.
Reporting by Nivedita Bhattacharjee in Bengaluru; Editing by Mark Heinrich, Jamie Free, and Kevin Krolicki.

The objective of the Chandrayaan-3 lunar mission is to land a rover on the Moon’s surface and conduct scientific investigations, analyze the lunar environment, and gather data to enhance our understanding of the Moon.

The Chandrayaan-3 module will carry six payloads, including instruments such as the Laser Actuated Breakdown Spectroscope (LIBS), Alpha Particle X-ray Spectrometer (APXS), RAMBHA, and ILSA. These payloads will help study the lunar surface, analyze the composition of minerals, and examine the lunar climate.

The lander and rover of the Chandrayaan-3 mission have a mission life of one lunar day, which is approximately 14 Earth days. However, the propulsion module’s payloads can remain functional for three to six months after the lander has been ejected.

Chandrayaan-3 is scheduled to launch on July 14, 2023, marking another significant milestone in India’s space exploration journey.

 Chandrayaan-3 is targeting the lunar south pole as its landing site, which holds particular interest due to the presence of water ice. This discovery could have implications for future space missions and the establishment of a potential space station.

Chandrayaan-3 is expected to take approximately 42 days to travel from Earth to the Moon, covering a distance of about 384,400 kilometers.

The United States, the former Soviet Union, and China are the three countries that have successfully accomplished controlled lunar landings. If successful, India will join this exclusive group with Chandrayaan-3.

The approximate budget allocated for the Chandrayaan-3 mission is ₹615 crore, reflecting the significant investment and commitment to advancing India’s space exploration endeavors.

The Chandrayaan-3 rover will carry the public seal and ISRO logo, which will be imprinted on the lunar regolith (soil) during its landing on the Moon. This will symbolize India’s presence and achievement on the lunar surface, leaving a visible imprint that represents the country’s contribution to space exploration.

 Chandrayaan-3 represents a major mission for India, showcasing the country’s advancements in space technology and its growing role in the global space community. The mission embodies India’s aspirations for scientific discovery and pushing the boundaries of space exploration.

The name of the lander for Chandrayaan-3 is Vikram.

The launch date for Chandrayaan-3, India’s highly anticipated lunar mission, is scheduled for July 14, 2023.

The approximate budget for the Chandrayaan-3 mission is ₹615 crore.

The mission date for Chandrayaan-3, India’s lunar mission, is currently set for August 23, 2023.

Chandrayaan-3 is planned to land on the Moon’s surface on August 23, 2023.

Chandrayaan-3 is expected to take approximately 42 days to reach the Moon from the Earth.

 
 

Leave a Reply

Your email address will not be published.

Previous Story

“Tragic Kidnapping of Rajasthani Woman Ends in Grim Discovery: Seeking Justice and Safety for Women”

Next Story

Pune Farmer Generates ₹2.8 Crore Revenue from Tomato Sales, Aims Higher.

Latest from India